In this module, I learned how to georeference data. I found that adding the control points was easy and a little bit relaxing. I used points such as building corners for most of my points as these are static points and good for high accuracy, and I removed points that had a high residual number. The goal was to have a low RSME number and an accurate image. The most difficult section of this part of the module was working between the various layers (Heritage Hall, uwf_n.jpg, and uwf_s1.jpg). Next, I used the create feature to draw a new building and a new road on the map. I also learned to add hyperlinks to attribute tables. The buffer tool was used in a previous module, but I used it again to create a buffer of 330 feet and of 660 feet around the eagle's nest on campus.
Subscribe to:
Post Comments (Atom)
Final Project
GIS5050 Manatee-Sarasota County Transmission Line Transcript : https://drive.google.com/file/d/1bApTXteguFQdfzr802_hPY8hLXz7482H/view?usp=...
-
In lab this week, we collected data on public safety features and their condition (like new, functional but with some wear, or broken) usin...
-
In this module, we learned how to create buffers using a variety of overlay techniques. I created a fixed distance buffer by using th...


No comments:
Post a Comment